Request Information

Shasta Tehama Trinity Joint College District

Location: Red Bluff, CA
General: Gifford Construction
Installer: Hanes Flooring
Scope: 15,000 square feet - New Construction
Product: Synthetic10

  • Preventing concrete moisture
  • shasta
  • college
  • Concrete Moisture Damage
  • Moisture Damage prevention
  • concrete moisture
  • preventing concrete moisture during the 
pouring process with our Synthetic10 was a new concept

Lionakis of Sacramento, CA is dedicated to being the firm of choice for many clients on the west coast. Those of you who work with this firm, know they are a dominating force for designs and are continuing to grow by adding multiple west coast locations to their list of accomplishments.

Synthetics International had the pleasure of working with Lionakis on the Tehama College Center. Working closely with one of the firms specification writers, Synthetics International offered the latest design methods for preventing concrete moisture and the use of our Synthetic10 technology.

While above slab vapor retarders and Synthetics International products were not new to Lionakis, preventing concrete moisture during the pouring process with our Synthetic10 was a new concept. The firm had used a more traditional method for correcting concrete moisture levels after moisture testing and a potential problem was discovered. Also, the use of Synthetic10 offered an attractive cost savings to the client of over $40,000.

The communication and execution offered by Gifford Construction is among the best we have encountered. With a construction schedule of 7 months, the concrete moisture levels were at low of 2.8 lbs. Offering some of the lowest moisture results for a new construction project.

Truly a project worth sharing and one of the best Synthetics International higher education references.

Request more information or Contact our technical department for more on this project and the hundreds of projects we complete each year.